Delta Townhouse Poly B™ Remediation Case Study
Explore how Urban Piping, a complete Poly B™ Replacement specialist, successfully carried out a full remediation project for Joan’s tidy townhouse on 117a Street in Delta.
The Challenge: Finding a Complete Poly B™ Remediation Company
Joan struggled to find a plumbing company in the lower mainland that would handle a complete poly b remediation. She came across Urban Piping in Burnaby and discovered that our company employs all the trades needed to complete a poly b replacement without subcontracting.
Prepping the Tidy Townhouse and Getting Started
Once Joan chose Urban Piping for the project, our team arrived at her extremely tidy townhouse. After prepping the house, we began the poly b replacement process.
Completion in Just 4 Days
Our team efficiently replaced all the poly b piping with new color-coded Class A PEX, repaired all the walls and ceilings, textured the ceiling, and painted the walls. The entire project was completed in only 4 days, ensuring minimal disruption to Joan’s life.