Edmonton Poly B™ Replacement Case Study: Efficient Project on 170th Avenue
In this case study, we present a Poly B™ Replacement project in a residential home on the 8000 block of 170th Avenue in Edmonton. The Urban Piping team demonstrated their expertise and efficiency, completing the project to the homeowner’s satisfaction.
Project Background
Homeowner Eugene contacted Urban Piping after reading numerous positive reviews about their state-of-the-art poly b replacement techniques and efficiency. He needed a reliable team to replace the faulty piping in his home quickly and professionally.
Plumbing Process
Urban Piping’s Edmonton plumbers, Shawn and Chris, tackled the project head-on. They worked through the night, replacing all the poly b piping with color-coded Class A PEX piping by the next morning. The new piping installed was rated for 500 psi and came with a 20-year warranty.
Restoration and Additional Requests
Once the plumbing work was completed, drywall expert Donald took over to repair any holes made during the pipe replacement process. At the homeowner’s request, Donald also scraped the main floor ceiling and applied a “knockdown” texture while repairing walls and ceilings.
Project Outcomes and Performance
The Urban Piping team’s professionalism, expertise, and efficiency resulted in a successful poly b replacement project completed within five business days. The homeowner was delighted with the quality of work, the additional ceiling texture work, and the minimal disruption to their daily life.